Nutricia Bolshevik Alcan Harrys Lactalis Michelin Renault Danone Nexans Isover Onduline Barry Callebaut 
 
    Istra, Moscow region
  • Steam Production (LOOS boiler): 3 x 10 t/h at 24 bar, including steam pressure reducing station (24-4 bar)
  • Boiler house building 300 m2 and chimney 50 m
  • Heating Hot Water Production (plate heat exchangers): 2 x 1 MW variable temperature for heating
  • Sanitary Hot Water Production (SarenergoMash volumetric heat exchangers): 2 x 2,5 m3 storage capacity
  • Boiler Feeding Water (BWT equipment): 30 m3/h including deironing and reversed osmosis plants
  • Natural gas supply network 250 m, including pressure reducing station and commercial metering system
  • Light Oil Fuel Supply system, including two storage tanks, 2 x 15 m3
  • Fluids Distribution: 1200 m of piping, including high pressure steam line
  • Auxiliary engineering systems of boiler house, including fire detection (FM approved), HVAC, plumbing and electrical distribution
Panoramic views
Nutricia Bolshevik Alcan Harrys Lactalis Michelin Renault Danone Nexans Isover Onduline Barry Callebaut 

Energy Service Logo